Toyota Land Cruiser 100/Amazon, Lexus LX 470

since 1997 release

Repair and operation of the car



Toyota Land Cruiser, Amazon, Lexus LX470
+ Identification numbers of the car
+ Governing bodies and methods of safe operation of the car
+ Settings and routine maintenance of the car
+ Engine
+ Cooling systems of the engine, heating of salon and air conditioning
+ Power supply system and production of the fulfilled gases
- Engine electric equipment
   Specifications
   Start of the engine from the auxiliary power supply
   Removal and installation of the rechargeable battery
   Check of a state and replacement of wires of the battery
   System of ignition - the general information and precautionary measures (petrol models)
   Check of functioning of system of ignition
   Replacement of the coil of ignition
   Check and adjustment of installation of a corner of an advancing of ignition/injection of fuel of the petrol engine
   Replacement of the module of ignition
   System of a charge - the general information and precautionary measures
   Check of a condition of system of a charge
   Removal and installation of the generator
   Check of a state and replacement of components of the generator
   System of start - the general information and precautionary measures
   Check of serviceability of functioning of a starter and chain of start
   Removal and installation of a starter
   Removal and installation of the traction relay
+ Control systems of the engine and decrease in toxicity of the fulfilled gases
+ Gear shifting box
+ Transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


08d33331



System of ignition – the general information and precautionary measures (petrol models)

On the models considered in the present manual the system of direct ignition without distributor and high-voltage wires is used.

Sensors of provision of distributive and cranked shaft (CMP and ICR), set individual for each of cylinders of coils of ignition and the ignition module are a part of systems of direct ignition. The onboard processor (ESM) develops the basic signals defining an order of connection of the module of ignition to each of coils according to the current provision of a bent shaft. Installation of a corner of an advancing of ignition is carried out by the module of management on the basis of the analysis of the signals arriving from various information sensors which are a part of systems of ignition and injection of fuel. Here ECT, VSS, TPS sensors, provisions of AT, the expense measuring instrument the MAF air/sensor, the detonation sensor enter (see the Head of the Control system of the engine and decrease in toxicity of the fulfilled gases). The module of ignition carries out distribution of a signal between coils and controls duration of impulses of their operation (on primary current).

At service of systems of direct ignition it is necessary to observe special precautionary measures:
   
   a. If the engine is not started, do not hold the ignition key ON which are continuously turned in situation within more than 10 seconds in a row;
   b. You watch that connection of a tachometer was carried out strictly according to instructions of manufacturers, some of the released measuring instruments can not be suitable for use on these models;
   c. Do not allow grounding of contact plugs of coils of ignition on weight at all, – the slightest imprudence in this question can lead to failure of the module of ignition and/or actually coils;
   d. Do not disconnect the battery at the working engine;
   e. You watch for correctness of grounding of the module of ignition.